Skip to main content
Skip table of contents

Material reservations

Introduction

Production Planning button

The Production Planning environment in FactoryLogix NPI makes use of a reservation system to “lock” specific material instances (UIDs) to specific batches. These reservations ensure that the materials required to build something are on hand when production begins on the factory floor. By default, required materials are reserved using First In First Out (FIFO) rules so that the oldest materials are consumed first.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.